Project files of moving project in Takeda Precision (Wuxi) Co., Ltd
Operation period: On May 16th, 2003, conduct lifting, unloading, moving and fixing operations to 40’×2 and 20’×1 equipment. During that period, turn one piece of 18T equipment with two lifts.