Project files of handling project in Koyo Electronics (Wuxi) Co., Ltd
Equipment: one hoist of 25T, one forklift of 5T, one hanging basket and one tool vehicle
Number of operators: 11
Operation period: 14.12.2006
Task: Grounding, unloading, lifting to the second floor and fixing of 20’×1 container.
|